ODOT 204022 Putnam SR 613 Cul

Eclipse replaced an existing concrete box culvert under a road, replaced the asphalt roadway

ODOT 164012 Culverts FY2017

Eclipse replaced three culverts in Clermont County.

ODOT 174004 SR814/SR540 Culvert

Eclipse replaced twin 48 inch diameter concrete-reinforced pipes and twin 48 x 76 inch

ODOT 170507 IR74 Culvert Replacement

Eclipse worked to improve various sections of I-74 in Green Twp, Hamilton County, OH

ODOT 170562 US42 Culvert Warren

Eclipse completed field paving, replaced conduits, bored, jacked and installed cured liners, and completed

ODOT 170638 SR748 Slide Repair

Eclipse removed and replaced deteriorated culverts and installed 370 cubic yards of 12 inch

ODOT 184015 Franklin SR123

Eclipse completed bridge repairs to combat scour accumulation and to protect the bridge from

ODOT 180505 BUT/HAM Culv FY19

Eclipse replaced and rehabilitated culverts and full depth pavement, and completed planing and resurfacing.

ODOT 180581 IR71 Drainage Main

Eclipse removed and replaced failed concrete slope along the existing Duck Creek and installed

ODOT 190035 US6 Culvert Replac

Eclipse removed existing pavement, widened asphalt pavement, graded and installed a new culvert.

CR540 Barklow Rd Ext SCI-CR540

Eclipse installed roadside utilities and restored the shoulder.

ODOT 194004 CLE/WAR Culv FY19

Eclipse replaced, rehabilitated, and maintained culverts.

ODOT 190192 MUS SR666 Culvert

Eclipse replaced a box culvert under an overhead railroad crossing.

ODOT 197050 SR123 Slide Repair

Eclipse cleared the area of organic material and performed earthwork to repair the roadside

ODOT 190287 D05 Culverts FY19

Eclipse installed new pipe culverts, shaped the road slide, installed new guardrail, replaced segments

ODOT 190400 PER SR13

Eclipse installed utilities and storm sewer structures, performing site earthwork to create a new

ODOT 190550 PRE Culvert FY2020

Eclipse removed and replaced a concrete culvert, installed storm structures and restored the area.

ODOT 194028 SR124 Bridge Replacement

Eclipse removed and replaced a concrete culvert, replaced segments of asphalt roadway and added

ODOT 194024 D08 Culv FY2020

Eclipse rehabilitated existing CMP culverts by pouring concrete along the bottom and using concrete

ODOT 200077 SR676 Slide Repair

Eclipse installed storm structures, removing and replacing the road throughout the project. Our team

ODOT 200594 IR275 Slide Repair

Eclipse repaired the road slope, replacing asphalt segments that had been cracking from the

ODOT 204027 SR37 Culverts

Eclipse replaced several pipe and concrete box culverts with CMP culverts, finishing the project