Eclipse completed field paving, replaced conduits, bored, jacked and installed cured liners, and completed minor structural bridge work. Our team treated approximately 900 square yards of concrete bridge decks with gravity fed resin, installed 250 pounds of epoxy-coated reinforcing steel and field paved 1,300 feet of various sized culverts.
Ohio – South and Western Projects
ODOT 170562 US42 Culvert Warren
FEATURED PROJECTS
Eclipse removed and replaced a storm sewer outlet on the coastline of Lake Erie.
- Ohio – Northeast Projects
- Ashatubla, OH
Eclipse installed 400 feet of storm sewer utilities to reduce flooding in Northfield, Ohio
- Ohio – Northeast Projects
- Northfield, OH
Eclipse installed 5000 square feet of pervious pavers to improve storm sewer functionality for
- Ohio – Northeast Projects
- East Cleveland, OH
Eclipse worked with Infinity Construction to complete grading and install a waterline, storm drains
- Ohio – Northeast Projects
- Kent, OH
Eclipse rebuilt the embankment off of I-480 in Garfield Heights. Our team performed preventative
- Ohio – Northeast Projects
- Garfield Heights, OH
Our team worked in Geauga County to replace an existing bridge in Parkman Township.
- Ohio – Northeast Projects
- Parkman Township, OH
Eclipse extended the Sawmill Parkway by approximately a quarter mile, excavating retention basins to
- Ohio – Northeast Projects
- Delaware, OH
Eclipse worked with the North East Ohio Regional Sewer District (NEORSD) to dredge the
- Ohio – Northeast Projects
- Parma, OH
Eclipse installed rock channel protection (RCP) within a creek bed to reduce erosion and
- Ohio – Northeast Projects
- Brecksville, OH
Eclipse installed the storm & sanitary sewer, fireline and domestic waterline for the Hall
- Ohio – Northeast Projects
- Canton, OH
Eclipse installed an 8’x4′ precast box culvert across SR 252 in Valley City. Our
- Ohio – Northeast Projects
- Medina, OH
Eclispe installed two precast culverts across SR116 in Van Wert County.
- Ohio – Northeast Projects
- Vanwert County, OH
Eclipse constructed a four-way roundabout at the intersection of SR-82 and Chamberland Road.
- Ohio – Northeast Projects
- Mantua, OH
Eclipse reconstructed Section F of Stafford Road, preparing the roadway for paving and striping.
- Ohio – Northeast Projects
- Auburn Township, OH
Eclipse installed new pipe culverts, shaped the road slide, installed new guardrail, replaced segments
- Ohio – South and Western Projects
- Knox, OH
Eclipse extended an existing 96 inch reinforced concrete pipe and buttressed the existing roadway
- Ohio – Northeast Projects
- Chagrin Falls, OH
Eclipse worked to install a bridge over a small waterway, completing the project with
- Indiana Projects
- Madison, IN
Eclipse completed trenching and duct bank installation for a commercial office fiber optic network
- Pennsylvania Projects
- Erie, Pa
Eclipse replaced a residential waterline, adding storm structures and repaving the roadway and driveways
- Ohio – Northeast Projects
- Burton, OH
Eclipse replaced several pipe and concrete box culverts with CMP culverts, finishing the project
- Ohio – South and Western Projects
- Corning, OH
Eclipse performed site earthwork, installed a parking lot drainage detention system, installed utilities and
- Ohio – Northeast Projects
- Elyria, OH
Eclipse poured new floor concrete and demolished an old cinderblock wall.
- Ohio – Northeast Projects
- Solon, OH
Eclipse performed earthwork, grading the site for general construction. Our team also installed site
- Ohio – Northeast Projects
- Hiram, OH
Eclipse installed site storm structures and utilties and graded the site for further general
- Ohio – Northeast Projects
- Cleveland, OH