Eclipse completed field paving, replaced conduits, bored, jacked and installed cured liners, and completed minor structural bridge work. Our team treated approximately 900 square yards of concrete bridge decks with gravity fed resin, installed 250 pounds of epoxy-coated reinforcing steel and field paved 1,300 feet of various sized culverts.
Ohio – South and Western Projects
ODOT 170562 US42 Culvert Warren
FEATURED PROJECTS
Eclipse installed tie back anchors and improved the drainage, including installing new catch basins,