Eclipse removed and replaced deteriorated culverts and installed 370 cubic yards of 12 inch rock channel protection for scour protection and 1,012 cubic yard walls (12 feet in height). Our team also designed, installed and maintained water diversion and removed and replaced aggregate and asphalt roadway.
Ohio – South and Western Projects
ODOT 170638 SR748 Slide Repair
FEATURED PROJECTS
Eclipse installed tie back anchors and improved the drainage, including installing new catch basins,
- North Carolina Projects
- Asheville, NC
Eclipse extended the Sawmill Parkway by approximately a quarter mile, excavating retention basins to
- Ohio – Northeast Projects
- Delaware, OH
Eclipse completed demolition and replacement of the existing dam and abutment walls on the
- Ohio – Northeast Projects
- Harperfield Township, OH
Eclipse replaced damaged perched culverts with a new bridge over Still Creek Roadway. Our
- Maryland Projects
- Greenbelt, MD