Eclipse repaired the road slope, replacing asphalt segments that had been cracking from the pull of gravity down the hill. Our team reshaped the slope to prevent future erosion and damage to the roadway.

Project Location

Whitewater Township, OH

Client

ODOT

Completion Date

June 30, 2021

Contract Value

$662,110