Ohio - Northeast Projects

KBK Strasburg
Highland Beach Storm Sewer Outfall Improvements

Eclipse removed and replaced a storm sewer outlet on the coastline of Lake Erie.

Sagamore Road Drainage Improvements

Eclipse installed 400 feet of storm sewer utilities to reduce flooding in Northfield, Ohio

Coit Road Farmers Market Green Infrastructure Project Phase 1

Eclipse installed 5000 square feet of pervious pavers to improve storm sewer functionality for

Kent State University Ice Arena/Band Educational Facility

Eclipse worked with Infinity Construction to complete grading and install a waterline, storm drains

Calcutta Acres Sanitary Sewer Improvements

Eclipse installed 15 new manholes throughout Calcutta, Ohio and over 600 feet of pipe

ODOT 230009 I-480 Slide Repair

Eclipse rebuilt the embankment off of I-480 in Garfield Heights. Our team performed preventative

Dix Park Trailhead Picnic Area

Eclipse installed the foundation of a new pavillion and gravel parking lot for Dix

Stafford Basin Inlet

Eclipse worked with the North East Ohio Regional Sewer District (NEORSD) to improve the

Farmington Rd. Bridge Replacement

Our team worked in Geauga County to replace an existing bridge in Parkman Township.

Sawmill Parkway Extension Phase G Part 1

Eclipse extended the Sawmill Parkway by approximately a quarter mile, excavating retention basins to

Upper Ridgewood Basin Improvements

Eclipse worked with the North East Ohio Regional Sewer District (NEORSD) to dredge the

Sherwood Trail Stormwater Improvements

Eclipse installed rock channel protection (RCP) within a creek bed to reduce erosion and

Hall of Fame Village – Center For Performance

Eclipse installed the storm & sanitary sewer, fireline and domestic waterline for the Hall

ODOT 224009 US 42/SR 252 Culvert Installation

Eclipse installed an 8’x4′ precast box culvert across SR 252 in Valley City. Our

ODOT 224000 SR 116 Culvert Replacement

Eclispe installed two precast culverts across SR116 in Van Wert County.

ODOT 210443 SR – 82 Roundabout

Eclipse constructed a four-way roundabout at the intersection of SR-82 and Chamberland Road.

Reconstruction of Section F of Stafford Rd

Eclipse reconstructed Section F of Stafford Road, preparing the roadway for paving and striping.

ODOT 200323 SR3/SR94 Culverts

Eclipse removed and replaced several culverts of varying materials.

Montrose Mazda of Kent

Eclipse removed old concrete driveway aprons, poured new concrete pads around existing storm structures,

Starbucks – Crocker Park

Eclipse completed demolition of the existing parking lot, installed new concrete sidewalk and curb,

UA Infrastructure-Main Campus

Eclipse replaced sections of damaged concrete roadway and driveways, installed new railing and concrete

ODOT 174003 US42 Utility Misc

Eclipse installed a 36 inch conduit and concrete-encased conduits under I-90 in association with

Beachwood Fire Station No. 2

Eclipse constructed a new asphalt parking lot, aggregate parking lot, vegetative bio-swale features, asphalt

ODOT 174007 SR164 Culvert

Eclipse rehabilitated existing twin 120 inch corrugated pipes by lining the existing culvert.

Lodi Community Hospital

Eclipse completed demolition of existing stairs and stairwells on the exterior of the building,

Kent/Portage Bike & Hike Trail

Eclipse installed new storm sewer structures, poured concrete curb and sidewalk, installed metal guardrailing,

CSU – NEB Site Concrete

Eclipse performed earthwork and demolition of existing underground structures, creating room for new features.

Beachwood 2017 Capital Road

Eclipse repaired and resurfaced the roadway in four separate locations within the Beachwood city

Painesville US20 Streetscape

Eclipse constructed pedestrian rest areas, signage, entrance arch and appurtenances.

No more posts to show