Eclipse removed and replaced a storm sewer outlet on the coastline of Lake Erie.

Eclipse installed 400 feet of storm sewer utilities to reduce flooding in Northfield, Ohio

Eclipse installed 5000 square feet of pervious pavers to improve storm sewer functionality for

Eclipse worked with Infinity Construction to complete grading and install a waterline, storm drains

Eclipse installed 15 new manholes throughout Calcutta, Ohio and over 600 feet of pipe

Eclipse rebuilt the embankment off of I-480 in Garfield Heights. Our team performed preventative

Eclipse installed the foundation of a new pavillion and gravel parking lot for Dix

Eclipse worked with the North East Ohio Regional Sewer District (NEORSD) to improve the

Our team worked in Geauga County to replace an existing bridge in Parkman Township.

Eclipse extended the Sawmill Parkway by approximately a quarter mile, excavating retention basins to

Eclipse worked with the North East Ohio Regional Sewer District (NEORSD) to dredge the

Eclipse installed rock channel protection (RCP) within a creek bed to reduce erosion and

Eclipse installed the storm & sanitary sewer, fireline and domestic waterline for the Hall

Eclipse installed an 8’x4′ precast box culvert across SR 252 in Valley City. Our

Eclispe installed two precast culverts across SR116 in Van Wert County.

Eclipse constructed a four-way roundabout at the intersection of SR-82 and Chamberland Road.

Eclipse reconstructed Section F of Stafford Road, preparing the roadway for paving and striping.

Eclipse removed and replaced several culverts of varying materials.

Eclipse removed old concrete driveway aprons, poured new concrete pads around existing storm structures,

Eclipse completed demolition of the existing parking lot, installed new concrete sidewalk and curb,

Eclipse replaced sections of damaged concrete roadway and driveways, installed new railing and concrete

Eclipse installed a 36 inch conduit and concrete-encased conduits under I-90 in association with

Eclipse constructed a new asphalt parking lot, aggregate parking lot, vegetative bio-swale features, asphalt

Eclipse rehabilitated existing twin 120 inch corrugated pipes by lining the existing culvert.

Eclipse completed demolition of existing stairs and stairwells on the exterior of the building,

Eclipse installed new storm sewer structures, poured concrete curb and sidewalk, installed metal guardrailing,

Eclipse performed earthwork and demolition of existing underground structures, creating room for new features.

Eclipse repaired and resurfaced the roadway in four separate locations within the Beachwood city

Eclipse constructed pedestrian rest areas, signage, entrance arch and appurtenances.

Eclipse removed and replaced concrete sidewalks and curbs, installed storm sewer utilities and restored