Eclipse rebuilt the embankment off of I-480 in Garfield Heights. Our team performed preventative maintenance to reduce slide risk in the future.
Ohio – Northeast Projects
ODOT 230009 I-480 Slide Repair
FEATURED PROJECTS
Eclipse installed tie back anchors and improved the drainage, including installing new catch basins,
- North Carolina Projects
- Asheville, NC
Eclipse extended the Sawmill Parkway by approximately a quarter mile, excavating retention basins to
- Ohio – Northeast Projects
- Delaware, OH
Eclipse completed demolition and replacement of the existing dam and abutment walls on the
- Ohio – Northeast Projects
- Harperfield Township, OH
Eclipse replaced damaged perched culverts with a new bridge over Still Creek Roadway. Our