Eclipse installed an 8’x4′ precast box culvert across SR 252 in Valley City. Our team also performed culvert repairs on a separate culvert under US 42.
Ohio – Northeast Projects
ODOT 224009 US 42/SR 252 Culvert Installation
FEATURED PROJECTS
Eclipse installed tie back anchors and improved the drainage, including installing new catch basins,
- North Carolina Projects
- Asheville, NC
Eclipse extended the Sawmill Parkway by approximately a quarter mile, excavating retention basins to
- Ohio – Northeast Projects
- Delaware, OH
Eclipse completed demolition and replacement of the existing dam and abutment walls on the
- Ohio – Northeast Projects
- Harperfield Township, OH
Eclipse replaced damaged perched culverts with a new bridge over Still Creek Roadway. Our