Eclipse rehabilitated the existing bridge, performing work including slip-lining new corrugated metal multi-plate arches onto new reinforced concrete strip footings, constructing new reinforced concrete inverts, rehabilitating existing stone head walls, constructing new pile and lag earthen retaining wall with stone facing and stream alignment to prevent future scour.
Ohio – Northeast Projects
ODOT 184000 MLK Bridge
FEATURED PROJECTS
Eclipse installed tie back anchors and improved the drainage, including installing new catch basins,
- North Carolina Projects
- Asheville, NC
Eclipse extended the Sawmill Parkway by approximately a quarter mile, excavating retention basins to
- Ohio – Northeast Projects
- Delaware, OH
Eclipse completed demolition and replacement of the existing dam and abutment walls on the
- Ohio – Northeast Projects
- Harperfield Township, OH
Eclipse replaced damaged perched culverts with a new bridge over Still Creek Roadway. Our
- Maryland Projects
- Greenbelt, MD