Eclipse removed an existing pedestrian bridge and installed concrete sidewalks.
Indiana Projects
Douglas Center Pedestrian Bridge
FEATURED PROJECTS
Eclipse installed tie back anchors and improved the drainage, including installing new catch basins,
- North Carolina Projects
- Asheville, NC
Eclipse extended the Sawmill Parkway by approximately a quarter mile, excavating retention basins to
- Ohio – Northeast Projects
- Delaware, OH
Eclipse completed demolition and replacement of the existing dam and abutment walls on the
- Ohio – Northeast Projects
- Harperfield Township, OH
Eclipse replaced damaged perched culverts with a new bridge over Still Creek Roadway. Our
- Maryland Projects
- Greenbelt, MD