Eclipse completed a 30 foot tall slope repair toe to top of the slope. Our team removed 1000 CY of material and replaced it with either supplemented or excavated material.
Ohio – Northeast Projects
Hickory Ridge Slope Repair
FEATURED PROJECTS
Eclipse installed tie back anchors and improved the drainage, including installing new catch basins,